Drinks Logistics Warehouse and Regional Distribution Centre

Build Time

24 weeks

Budget

£5.5m

Sectors

Logistics & Distribution

Location

Coventry

Fit out of a brand new warehouse, as a regional drinks storage and distribution warehouse.
The project involved:

  • erection of insulated envelope to create chill store
  • propane refrigeration system
  • pallet, cantilever and carton live racking systems
  • mezzanine areas
  • internal Armco protection and floor marking
  • installation of fuel station and vehicle wash and associated civil and drainage works
  • installation of new roller shutter doors, including portal steel frame strengthening works
  • CCTV, access control and security system; fire alarm and smoke detection system
  • installation of backup generator
  • a new canopy and an extension to the existing canopy

Gallery

Testimonial

“JJL completed a multi-disciplined and complex fit out of a brand new warehouse to facilitate the move of our RDC to Coventry.
Despite the project commencing in December and being carried out over the winter months, JJL and their team coped well with some extremely harsh weather without compromising the completion date.
As always JJL brought innovative design ideas to the table to ensure that the project was not only to the required specification but also to an extremely high standard.”

- Adam Waldron, Senior Property Projects Manager

Regional Distribution Centre - Coventry

Send us an enquiry

Accreditations